ProjectWise InterPlot Server  
 

 
 
Home Search Archive Browse Document Pool Log Off  
    BikePath_AsBuilts_

Archive Table of Contents

Order Plot Set Name Pin Project Name Project Number Year Route Number County Bridge Number Included Towns Comments
90942 02F136 02f136 Wallingford STP ST WALK (14) 2010 Pedestrian Bridge Rutland   Wallingford Rehabilitate and assemble historic truss over Otter Creek at the Wallingford town park.
90927 02F136 02f136 Wallingford STP ST WALK (14) 2010 Pedestrian Bridge Rutland   Wallingford Rehabilitate and assemble historic truss over Otter Creek at the Wallingford town park.
72708 03f024 03f024 Swanton STP ST MHTB (1) 2009 NA Franklin   Swanton Rehab and reset the former Milton BR 18 Truss for use over the missisquoi River at the location of the former covered railraod bridge.
72702 08F246 08F246 Statewide STP NWRT(1) 2010 Missisquoi Valley & Beebe Spur Rail Trail Franklin, Orleans   Berkshire, Derby, Enosburg, Fairfield, Newport, Richford, Sheldon, St. Albans, Swanton Rehabilitate the aggregate surface of the Missisquoi Valley and Beebe Spur Rail Trails.
64687 01f194 01f194 Essex STP WALK (9)   VT 15 Chittenden   Essex New concrete sidewalk, catch basins, fencing, roadway widening with new base, signs and pavement markings.
64686 98f116 98f116 Brattleboro BIKE (27)S 2006 NA Windham   Brattleboro Construction of a new Bike path and bridge over Whetstone River, Including new tree planters, fence, lighting, and lanscaping.
64685 92k302 92k302 Brighton STP BIKE (14)S 2004 NA Essex   Brighton Construction of a new pedestrian timber covered bridge, approach stairs, timber piers, and foundations
64684 91k210 91k210 Montpelier BWM-BIKE (4)S   NA Washington   Montpelier Winooski River West bikeway. Grading, Drainage, subbase, pavement, bridge structures, track and softball field relocation, lighting, fencing and signing for urban bike path.
64683 00f126 00f126 Newbury STP EH00 (1) 2003 Cross Vermont Trail Orange   Newbury Construction and improvements to abandoned RR bed.
64682 91k207 91k207 Essex BW-M BIKE (1) S 1993   Chittenden   Essex Bike Path
64681 99f278 99f278 Essex STP BIKE (35) 2003 VT 15 Chittenden   Essex Convert Rail Road Bed into a Bike Path
64680 92k294 92K294 South Burlington STP BIKE (6) 2003 FARRELL ST - SPEAR ST. - GUTTERSON FIELD HOUSE! Chittenden   South Burlington cONSTRUCTION OF BIKE PATH FROM FARREL ST TO UVM - GUTTERSON FIELD HOUSE INCLUDING GRADING, DRAINAGE, PAVEMENT, BRIDGE, AND FENCING.
64679 93K187 93K187 St. Albans-Sheldon STP BIKE(18)S 1996 US 7, VT 105 Franklin   Fairfield, Sheldon, St. Albans, Swanton  
64678 XXb100 XXb100 Stowe BW-RS-BIKE(25) 9999 NA Lamoille   Stowe  
64677 97f112 97f112 Springfield STP BIKE (23) S 2000 US 5, VT 11 Windsor   Springfield Conversion of old Railbed into Bike Path
64676 93K188 93K188 Sheldon-Richford STP BIKE(17)S 1999 NA Franklin   Berkshire, Enosburg, Richford, Sheldon  
64675 95D014 95D014 South Burlington MEGC 5200(16)S 1995 TH 5 Chittenden   South Burlington  
64674 92k299 92k299 Putney STP BIKE (11)S 1998 TH 1 Windham   Putney Construction of a pedestrian path including reconstruction of the intersection of U.S. Route 5 and Kimball Hill Road. Work includes Cold Planing, Paving, Drainage, Guard Rail, Landscaping, Signs
64673 92k295 92k295 Killington STP BIKE (7) 2001 Killington Road Rutland   Killington Paving, Drainage, Landscaping, Signs, Bridge Work
64672 00f022 00f022 Sheldon STP BIKE (37)S 2003 NA Franklin   Sheldon Replace bridge span with timber deck & prefab steel truss. Construct cattle crossing. Place and grade limestone on bike path surface.
64671 92k926 92k296 Hartford STP BIKE (8)S 2001 US 5 Windsor   Hartford Grading, subase, drainage, pavment, fencing, markings. lighting and bridge retaining walls.
64670 01a008 01a008 Brattleboro-Westminster IM 091-1(41)   I 91 Windham   Brattleboro, Dummerston, Putney, Westminster Cold Polaning, Paving, Guard Rail, Signs.
64667 02F136test 02f136 Wallingford STP ST WALK (14) 2010 Pedestrian Bridge Rutland   Wallingford Rehabilitate and assemble historic truss over Otter Creek at the Wallingford town park.
64666 02F136 02f136 Wallingford STP ST WALK (14) 2010 Pedestrian Bridge Rutland   Wallingford Rehabilitate and assemble historic truss over Otter Creek at the Wallingford town park.
64665 02f136 02f136 Wallingford STP ST WALK (14) 2010 Pedestrian Bridge Rutland   Wallingford Rehabilitate and assemble historic truss over Otter Creek at the Wallingford town park.
64664 03f038 03f038 Colchester STP BIKE(48) 2004 NA Chittenden   Colchester Construction of a new shared-use path.
64663 02F136 02f136 Wallingford STP ST WALK (14) 2010 Pedestrian Bridge Rutland   Wallingford Rehabilitate and assemble historic truss over Otter Creek at the Wallingford town park.
64662 02f170 02f170 West Rutland STP WALK (11) 2004 VT 133 Rutland   West Rutland Rehab and assemble a historic truss bridge over the Clarendon Brook
64661 03f038[1] 03f038 Colchester STP BIKE(48) 2004   Chittenden   Colchester Construction of a new shared-use path.
64660 01f132 01f132 Burlington-Colchester STP BIKE (45) 2004 NA Chittenden   Burlington, Colchester Installation of new bridge superstructure over the Winooski River and construction of a new shared-use path
64659 96K216 96k216 Derby STP BIKE (19)S 1999 NA Orleans   Derby Reconstruct Railroad bed into bike path